Login|Register|Forgot Password|Manage vibo|For Mobile|Contact|Cart
Company MemberYear 1

Dongguan S-Bright Hardware Machinery Co., Ltd.  
Follow0

Main business not filled in ~~

Search
News
  • 暂无新闻
产品分类
  • 暂无分类
Contact


请先 登录注册 后查看


Search
 
Honor
  • 暂未上传
Link
  • 暂无链接
首页 > Sell > Latest Aluminium Alloy CNC Machining Parts
Latest Aluminium Alloy CNC Machining Parts
单价 0.10对比
询价 暂无
浏览 30
发货 广东东莞市
库存 1
过期 长期有效
更新 2025-04-12 06:37
 
详细信息
  • Application:Metal
  • Performance Classification:High-End CNC Machine Tools
  • Certification:SGS, ISO 9001
  • Process Usage:
  • Numerical Control:
  • Movement Method:
  • Control Method:
  • Condition:New
  • Processing Precision:±0.05mm
  • Export Markets:Global
Introduction:
1. Sheet Metal Fabrication, CNC Machining Parts, CNC Lathing Parts, CNC Machined Part
2. Material: Aluminium, stainless steel, tool steel, brass, copper, bronze, tungsten carbide, HSS, POM, titanium etc
3. Lemo Mold Components Co., Ltd can customize strictly all the mold components and CNC machining parts arrording to customer's CAD and 3D drawings.
4. Precision Turning parts, mold insert, machine parts, lathing parts, machinery parts, wire EDM components, CNC milling accessories, hardware fittings, metal forming parts, carbide parts, aluminum alloys parts, Automotive parts, etc.

Aluminium Alloy 6082 T6/6061 T6 CNC Machining PartsAluminium Alloy 6082 T6/6061 T6 CNC Machining PartsAluminium Alloy 6082 T6/6061 T6 CNC Machining Parts


1. CNC Machining Parts, CNC Lathing Parts, CNC Machining Part
2. Material: Aluminium, stainless steel, steel, brass, titanium etc
3. OEM&ODM are welcomed.
These products are showed here only to present the capability of our business activities, we can produced according to your drawings or sample.
It would be our proud to serve you at once we receive your valued enquiry with detailed specification and drawings, and we will submit our competitive offer ASAP
Work TypeCNCMaterial
 
Maximum Size
 
Hardness(HRC)
 
Tolerance0.01mm-0.1mmSurface TreatmentAnodizing
Sample Lead Time20 daysSurface FinishRa0.2
Production Lead TimeNegotiableProducer Surplus10000pcs