Eupassion Furniture Manufacturer is specialized in producing glass & metal dining room furniture in foshan china. We offen modern and favorable price dining table, dining chair, and coffee table etc. Please feel free to ask us for a quote!
Item Name: Stainless Steel MDF Dining Table with PU Chair (ET37 & EC51-1)
ET37: Dining table, MDF + Stainless steel, size can be available in 150cm, and 180cm. 12mm tempered glass. KD packing 0.22CBM/PC
EC51-1: Dining chair, stream line back and seat, chrome base, color available in many choices. 0.4CBM/6PCS
Material & Size (MDF+GLASS, 1500X900X760mm)
Table Top: One PC marble, edges polished. Thickness=12mm 1500X900mm
Top :12MM tempered glass,
Support /Leg: MDF with high glossy painting. color can be changed to black and wanut as well.
Features:
1. Water proof, rust proof, easy for cleanning
2. The design, color, size can be customized.
Payment Term:
1. 30% deposit, 70% before shipment.
Delivery time:
15-25 days after the deposit

Item Name: Stainless Steel MDF Dining Table with PU Chair (ET37 & EC51-1)
ET37: Dining table, MDF + Stainless steel, size can be available in 150cm, and 180cm. 12mm tempered glass. KD packing 0.22CBM/PC
EC51-1: Dining chair, stream line back and seat, chrome base, color available in many choices. 0.4CBM/6PCS
Material & Size (MDF+GLASS, 1500X900X760mm)
Table Top: One PC marble, edges polished. Thickness=12mm 1500X900mm
Top :12MM tempered glass,
Support /Leg: MDF with high glossy painting. color can be changed to black and wanut as well.
Features:
1. Water proof, rust proof, easy for cleanning
2. The design, color, size can be customized.
Payment Term:
1. 30% deposit, 70% before shipment.
Delivery time:
15-25 days after the deposit


Product Name | Stainless Steel MDF Dining Table with PU Chair (ET37 & EC51-1) |
Material | 12 mmTempered Glass & MDF Tube; PU Chair, Chrome Legs |
Color | Clear Top Glass |
Size | Table: 1500*900*750 mm |
Chairs: 430*550*1030 mm | |
Packing | 5 layer Brown Carton, K-D Packing |
Payment term | T/T |
MOQ | 20 Sets |
Delivery time | 25 Days After Receiving Official Order |
Supply ability | 20, 000 Sets/Month |